Asta Powerproject
Builds and tracks the construction programme: tasks, links, critical path, resources and costs, with progress captured on a phone app.
- Review no.
- RS-R056
- Revision
- F
- Read at source
- 10 Nov 2026
- Disclosure
- None
- Method
- Read at the maker’s own source. Redstick has not used it.
Assessment
A standard for construction programmes, with progress captured on a phone app. The full program is Windows desktop and the site app is licensed separately; a 14-day trial, no prices published.
This kind of tool · Critical path programme software
What they offer is well understood in the industry: logic-linked project sequencing, resource- and cost-loaded (the cost side is less adopted in construction), that breaks a complex project into granular steps. Progress, changes, procurement, design, build and QA can all sit on one shared plan that every stakeholder works towards.
The catch: it's only as good as the planner who builds it and the discipline that updates it. A programme that isn't progressed is a picture of intent, not of the job. And stakeholder engagement is key: without it no programme moves beyond a vague intent to something everyone is working both with and towards.
The same note is on all 7 tools of this kind.
The catch
Windows desktop for the full program; the site app is licensed separately; no price published.
- Netherlands: on sale
- United Kingdom: on sale
- Canada: through a distributor
- United States: on sale
What it replaces
Microsoft Project or spreadsheet programmes for construction work.
Features
- Used on the phone, on site
- ✓ Yes
Who else does it
From people who've worked with it
None yet. If you’ve used it on a job, yours could be the first.
Worked with Asta Powerproject? Tell us how it went
Source and revisions
Source: Asta Powerproject - Eleco
Availability read at: Canada · Netherlands · United Kingdom · United States
Are you the maker?
This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.
<a href="https://redstick.io/reviews/asta-powerproject"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>