Dalux Handover
A tool for setting the client's information requirements, collecting product, asset and O&M data from the project team with sign-off, building O&M manuals, and passing the data to facility management, with COBie import and export.
- Review no.
- RS-R2169
- Revision
- B
- Read at source
- 16 Nov 2026
- Disclosure
- None
- Method
- Read at the maker’s own source. Redstick has not used it.
Assessment
Dalux sets the client's information requirements, collects and signs off the asset data and passes it to Dalux FM, with COBie import.
This kind of tool · Handover information and asset data
Replaces the O&M manuals in lever-arch files, chased for months after practical completion. Collect, check and hand over the building record, and keep it live for the owner. The win is a handover that's complete on the day.
The catch: it only works if the supply chain uploads as they go, not at the end.
The same note is on all 13 tools of this kind.
The catch
No price published; works best alongside Dalux Box, Field and FM.
What it replaces
O&M manuals assembled by hand from emailed files and COBie spreadsheets.
Who else does it
From people who've worked with it
None yet. If you’ve used it on a job, yours could be the first.
Worked with Dalux Handover? Tell us how it went
Source and revisions
Source: Dalux Handover
Are you the maker?
This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.
<a href="https://redstick.io/reviews/dalux-handover"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>