Skip to content
REDSTICK⌕
SaaSScaffolding and accessSafety and skills training in virtual reality

Metaverse Learning construction programmes

A library of licensed immersive training programmes for trade and construction courses (bricklaying, carpentry and joinery, plastering, painting and decorating, tiling, plumbing and gas, retrofit, heat pumps, solar, EV charge points, construction health and safety), run on VR headsets, desktops, tablets or immersive rooms, with a remote assessment tool.

Review no.
RS-R1957
Revision
C
Read at source
15 Nov 2026
Disclosure
None
Method
Read at the maker’s own source. Redstick has not used it.

Assessment

A library across the trades, from bricklaying to heat pumps, licensed to colleges and training providers by enquiry.

This kind of tool · Training in virtual reality

Replaces the first attempts at a trade on real materials and a classroom safety talk. Immersive programmes a trainee works through on a headset or tablet before the workshop or the site.

The catch: practice on a screen is not competence on site, and none publishes a price.

The same note is on all 2 tools of this kind.

The catch

Sold as licences to training providers rather than to a firm for one course, with no published prices.

Who forColleges, training providers and employers teaching construction trades and site safety.
By whomMetaverse Learning
United Kingdom
metaverselearning.co.uk ↗
Releasednot stated by the maker
Sold innot stated by the maker
PriceBy quoteFlexible licensing by enquiry; no prices published.

What it replaces

Practice that uses up bricks, plaster and paint in the workshop, and first attempts at site hazards made on a real site.

Who else does it

Compare all 4 for safety and skills training in virtual reality side by side →

From people who've worked with it

None yet. If you’ve used it on a job, yours could be the first.

Worked with Metaverse Learning construction programmes? Tell us how it went

Your own experience, in your own words: what you used it for, what it did well, what you’d warn someone about. John reads every report before anything goes on the page, and it goes on under your name, role and company, dated. No star ratings.

Source and revisions

Source: Metaverse Learning For Augmented & Virtual Reality Education, Training

RevDateChange
C15 Nov 2026Gaps not stated by the maker put on the fixed list (0033).
B15 Nov 2026Assessment drafted from John's earlier assessments, approved by John: now Reviewed.
A15 Nov 2026First read at source (hunt run 2026-11-15u).

Are you the maker?

This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.

Listed on Redstick
<a href="https://redstick.io/reviews/metaverse-learning-construction-programmes"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>